See how Brazil's COPEL cut substation design time by 50% and saved USD 630,000 annually using Bentleyās OpenUtilities Substation BIM workflows....
by Andrew McMahon
by Andrew McMahon
Beyond digital models: The digital twin paradigm shift Key takeaways: Geotechnical teams spend almost 20% of their week on data wrangling instead of engineering. Ground-related problems drive the vast majority of tunnel cost overruns and delays. Static geological models are...
by Oana Crisan
When we think of a foundation, we tend to picture whatās visible: the concrete slab under a bridge, the finished pavement of a highway, or the portal of a tunnel cutting into a hillside. These are the physical starting points...
by Amy Heffner, Director Transportation Industry and Product Marketing
by Kumar Saurabh
by Leif Johnson
Digital tools are reshaping how teams plan, design, and deliver infrastructure, bringing speed, accuracy, and collaboration to the forefront. Here is a quick summary of whatās driving this shift: Traditional rail design methods limit efficiency and digital integration. Bentley’s railway...
by Breda Kiely
by Narinder Manku
by Sharon Soler
As urban populations surge and transportation systems strain under increasing demand, cities around the world are grappling with mounting challenges in mobility planning. Mobility Simulation is becoming essential as agencies strive to address issues, such as congestion, safety concerns, and...
by Courteney Tinch