How Horizontal Civil Projects Are Using 4D/5D Construction Modeling

Mike Mahdavi Profile Image

Mike Mahdavi, Bentley Expert

Horizontal Civil Projects With 4D/5D Construction Modeling

Share

Heavy Civil Construction: Evolving Digitally in an Ever-Changing Industry

The adoption of a model-based workflow has not been as established in civil construction as it has been in vertical building construction. 3D design models are still not 100% the norm in the civil industry. Some companies still rely on 2D PDF plan sets and here we are talking about the fourth dimension for the 4D construction modeling: time. The industry has been changing very fast in the recent years, partly due to 3D BIM models becoming a standard deliverable on projects. Contractors are also realizing the benefits of adopting a model-based digital workflow to potentially cut costs and keep up in a highly competitive industry, as the competition is predicted to intensify even more in the coming years according to IBIS World.

Ā 

Construction SYNCHRO Civil 3D Model

3D BIM models increasingly becoming a project deliverable

Assuming we have a 3D BIM model available, there are still several obstacles to adding the extra dimensions of time or cost to progress a 3D civil model to 4Dā€”or even 5D. One of the main reasons is that building models are usually componentized, meaning that you would have discrete elementsā€”such as walls, stairs, doors, windowsā€”that you can then link to a schedule to create a 4D model.

However, civil models have traditionally been string-based with no discrete components to link to a schedule. The recent adoption of component-based approach by civil design applications has addressed this issue. However, if you want to assign a schedule to a pavement component, for instance, it would be a few-kilometers-long continuous component, which would not necessarily be constructed in that way.

Construction SYNCHRO Civil Components

Ā 

Civil components are usually continuous elements extending for several kilometers

Developing Capabilities Specifically for Horizontal Civil ConstructionĀ Ā 

The tools used in vertical building construction are not going to meet the requirements in horizontal civil construction. There is a great need for specialized tools suitable for linear infrastructure. These specialized capabilities must also be integrated platforms, rather than point solutions, to address the frustrations of end users when integrating the ā€œsea of point solutions,ā€ according to McKinsey & Company. There is an enormous potential for productivity improvement. A smooth digital twin workflowā€”integrated from design all the way to construction and operationsā€”will save hundreds, if not thousands, of hours during the project lifecycle by preventing rework and preserving the value of the data from one phase of the project to the other. Inaccurate estimating can directly impact contractorsā€™ profitability and the quantity take-off alone can take up to 40% of the pre-bid resource hours, which could be automated using 3D models. Model-based quantity take-off was cited as the number one activity by 67% of the civil contractors using a model-based workflow, according to the recent Dodge Report. It was also determined that reduced rework was one of the top project outcome benefits of using model-based technologies.

SYNCHRO is Bentleyā€™s integrated construction management solution and addresses the problems faced by civil contactors when adopting a model-based workflow. The magic starts with SYNCHRO Control. This application is the cloud service that will take your modelā€”be it in an Autodesk, Bentley, or even an IFC formatā€”and make it available to the assigned team members who are not necessarily civil designers. All you need is a web browser, and not the native authoring application. From this point on, the model is synchronized throughout the different integrated applications of SYNCHRO 4D.

Construction SYNCHRO Civil Interoperability

Ā 

Interoperability of SYNCHRO 4D with other solutions

The same way that your bread slicer breaks your loaf into consumable parts, the role of SYNCHRO Modeler is to slice up the big civil design model into manageable chunks and constructible components. SYNCHRO Modeler is a desktop application that will access the design model made available in the cloud by SYNCHRO Control. Before anything, the first step is to use the Area Break Down tool to break the project into manageable chunks by creating construction work areas. Think of it as breaking your baguette in half to make it easier to handle before slicing. It is important to note that this process does not alter the original design, as in the case of the bread example, but only creates child-parent relationships between the elements. We can then use the quantity take-off tool to slice and dice each work area into constructible components and link them to the cost code.

Construction SYNCHRO Civil Area Break Down

Ā 

Area Break Down tool breaking the project into multiple work areas

Ā 

Construction SYNCHRO Civil Elements

Slicing civil elements into constructible components

The next step in our 4D journey is to access the same project in SYNCHRO 4D Pro. Most planners use P6 or MS Project, which SYNCHRO 4D Pro can easily import. However, SYNCHRO 4D Pro features a powerful CPM scheduling engine, which does not require any additional planning or scheduling tools. Schedules can be created simply by clicking 3D model elements in a sequence and automatically creating tasks with durations and logical relationships between the tasks. SYNCHRO 4D Pro also allows you to save multiple baselines of your current schedule and synchronize back and forth with popular scheduling software, such as P6. If the schedule needs to be exported, SYNCHRO supports exporting to multiple formats, such as Asta Powerproject, Microsoft Project XML, Primavera P6, IFC, Microsoft Excel, and SDEF. Itā€™s a big difference when compared to Navisworks Timeliner, which can only export to CSV or Microsoft Project XML format.

Construction SYNCHRO Civil Schedule

Ā 

Creating the schedule in SYNCHRO 4D Pro using the 3D model

So far so good, but what happens on a design and construct project, where changes to design models happen every week or even every day? Do you need to start from scratch after all that work? The answer is simple: no. Every time changes happen to your design model, there is a version compare capability within SYNCHRO Modeler that color codes the changes to the original version. You can then decide either to keep the way you had sliced those elements before or still keep the link to the cost code.

Construction SYNCHRO Civil Version Comparison

Ā 

Version compare tool within SYNCHRO Modeler to compare design changes

SYNCHRO Field can be installed on a phone or a tablet and is used to capture and access real-time data from the field. Using SYNCHRO Field, resource statuses and progress can be tracked directly on model elements and be synchronized back with SYNCHRO 4D Pro. SYNCHRO Field also provides simple civil and measurement tools for the field staff.

Construction SYNCHRO Civil Measurement Tools

Ā 

SYNCHRO Field civil and measurement tools

The final output from SYNCHRO can also include an animation, which communicates the construction process to the stakeholders and helps win projects.

Construction SYNCHRO Civil Sequence

Ā 

Construction sequence created using SYNCHRO (credit: Rail Infrastructure Alliance)

Civil Contractors Adopting To Digital Workflows

Civil contractors are quickly adopting digital workflows to keep up with the competition. Integration of design, construction scheduling, and project management toolsā€”with real-time data collection from the fieldā€”will unlock the value of data available to construction companies. Specialized digital tools for civil construction industry have now made it possible to utilize the data throughout the project lifecycle to avoid rework and save costs. Data visibility and insights from historic data will improve efficiency through predictive analytics. Contractors who are nimble and quickly adapt to change will have a competitive edge in the market in the coming years.

Want to learn more? Sign up for our webinar: 4D/5D Construction Modeling for Horizontal Civil Projects Using SYNCHRO 4D

Relevant Tags

In this article, you will learn how to simulate or animate an equipment movement a number of times during an ...
In this fun experiment, we tried to check if the physical quantity estimation for all the tasks follows Benford's law ...
To enhance international passenger experience and advance the Puget Sound region as a leading tourism and business gateway, the Port ...