Detailed Design of Bridges for BG Rail Link between Rishikesh to Karnaprayag

Bentley Expert Profile Image

Bentley Expert

Modern architectural facade with repeating triangular elements against a clear sky.

Share

Louis Berger SAS - A WSP Company / Detailed Design of Bridges for BG Rail Link between Rishikesh to Karnaprayag
Uttarakhand, India
BG Rail Link between Rishikesh to Karnaprayag

Project

The Char Dham is a famous circuit of four ancient Hindu temples in the north, south, east, and west of India, and are visited by many Hindus on pilgrimage each year. Badrinath, the northern temple, lies within the mountainous state of Uttarakhand. To provide easier passage to Badrinath, and to improve transportation for the people who live in the area, Rail Vikas Nigam Limited initiated development of a 125-kilometer rail line, with Louis Berger SAS responsible for designing some bridges for the project, including a 125-meter structure over the Ganges River. In addition to the difficulties of working in a mountainous area, this bridge had to be strong enough to endure the highest level of seismic activity in India.

Facts

  • To improve transportation to a temple in mountainous terrain in India, Louis Berger had to build a steel bridge that could withstand severe seismic activity.
  • They used ProjectWise to help all stakeholders quickly access the most up-to-date information, reducing the communication gap and expediting the development process.
  • By optimizing the design within STAAD, the team identified the effects of the loads across the structure and minimized errors while maintaining a high level of quality.

“During the process of analysis and design, optioneering has been conducted in STAAD to obtain the most efficient and economical arrangement of the steel components. After conducting an option study, as well as a concept study in STAAD, a final optimized configuration of the open web girder bridge was achieved.”

– Siddhartha Chatterjee, Head of Department – Structures, Louis Berger SAS

Solution

Louis Berger needed to create a design that suited the treacherous environment and ensured safe, reliable travel. Yet, they also had to determine how to safely build that design. Due to flash flooding that causes heavy water flow and unpredictable water levels on the Ganges River, traditional forms of bridge construction could lead to transportation collisions. The design team realized that they needed to assemble the bridge via a push launching method, which would require a relatively lightweight steel truss design instead of traditional concrete. Each bridge element would be fabricated offsite, transported to the construction zone, assembled into panels, and then lifted into place with the assistance of a temporary nosing attachment. To execute their ambitious plan, they needed reliable structural analysis software.

Outcome

Already a longtime user of Bentley applications, Louis Berger realized that the software could help them design both the complex structure and the unique building method. They first established a connected data environment with ProjectWise to manage all documents and help stakeholders collaborate. The team then designed the 125-meter bridge within STAAD and assigned materials and all applicable loads to the model. As the team adjusted the design to accommodate the unusual construction method, the application helped them quickly detect and resolve any mistakes or load variances and determine how to make the process more efficient.

Software

ProcureWare ProjectWise Software Logo

ProjectWise

Louis Berger saved significant development time and costs by using Bentley applications. Managing all documents with ProjectWise helped all stakeholders quickly access the most up-to-date information, reducing the communication gap and expediting the development process.Ā 

Staad software logo

STAAD

By optimizing the design within STAAD, the team identified the effects of the loads across the structure, including the strong seismic activity, and minimized errors while maintaining a high level of quality. The resulting design can be quickly assembled in the rugged project area. In the process, they lowered construction costs, reduced the amount of materials needed and lessened the impact on the environment. Louis Berger delivered their design to the client on time, which will help to build a reliable transportation link in the area and allow pilgrims safe passage.

Relevant Tags

The California Department of Transportation (Caltrans) initiated the California Toll Bridge Seismic Retrofit Program to determine the vulnerability of California’s ...

In response to customersā€™ requirements, ADINA supports the Bergstrƶm-Boyce and Three-Network viscoelastic material models. ...
An earthquake can cause a dam to crack or dislocate, or even cause its component blocks to detach. The damage ...

Subscribe to The Bentley Brief

Stay ahead of the curve with the latest infrastructure news and insights.