ESI Inc. of Tennessee / DCO Albany Green Energy Biomass Project
albany / georgia
Project
The DCO Albany Green Energy Biomass Project is a 50 megawatt, wood-fired renewable power facility capable of generating 425,000 pounds of steam per hour and is primarily used to supply Procter & Gamble with renewable energy. ESI of Tennessee (ESI) is designing and building this USD 200 million facility consisting of a biomass boiler, a condensing steam turbine generator, and a condenser.
This project was a nominee in the Power Generation category of the 2016 Year in Infrastructure Awards, now known as theĀ Going Digital Awards in Infrastructure.
Software
STAAD
Structural and stress analyses were key to the facilityās design. ESI usedĀ STAAD.ProĀ to analyze the 2,400 tons of structural components in the largest boiler,Ā
AutoPIPE
They also used AutoPIPEĀ to test the stresses of high pressure and heat on the pipe system. STAAD.Pro and AutoPIPE saved ESI a combined 700 resource hours on the project.