Beifang Investigation Design & Research Co. Ltd. / Memve’ele Hydropower Station
cameroon, africa
Project
On the River Ntem in Cameroon’s South Region, the Memve’ele Hydropower Station will have a total installed capacity of 211 megawatts with four single-capacity units of 52.75 megawatts and a water reservoir of 82.71 million cubic meters. Designing a reasonable layout scheme was key to the success of this USD 637 million project.
Facts
- The 3D information model of the station will be crucial to construction, operation, and maintenance.
- Common components applied to the 3D information model will serve as design templates on future projects.
Solution
Outcome
The efficient parametric modeling process enabled BIDR to master the layout for this geographically complex station. Modeling saved time and eliminated bottlenecks in the design process. Templates for components such as the spiral case, draft tube, and arch dam freed the engineers for more valuable and creative work. Overall, Bentley solutions shortened the design cycle from three months (using traditional 2D design) to one month, saving about USD 150,000.